How much did Albeni Falls Dam cost to build?

Albeni Falls Dam is a 90-foot-high concrete gravity dam on Idaho’s Pend Oreille River, built by the U.S. Army Corps of Engineers from 1951 to 1955 for flood-risk management, hydropower, navigation, recreation and fish and wildlife conservation. Its 755-foot crest joins a powerhouse and gated spillway; three Kaplan units provide 42.6 MW of capacity and generate about 200,000 MWh in an average year. USACE records an exact original construction cost of $31,949,360, while its historical overview rounds that figure to $34 million.

Final project cost

$31.9494 million

Cost basis: 1955

The Albeni Falls Dam on the Pend Oreille River — in Bonner County, within the Idaho Panhandle. Located between the towns of Oldtown and Priest River.
U.S. Army Corps of Engineers, photographer not specified or unknownPublic domain

Cost evidence

Basis of the published figure

Final project cost1955
nws.usace.army.mil

Project metrics

Key dimensions

Project record

Timeline