Road or highway 路 United States
How much did the South Bay Expressway toll section of California State Route 125 cost?
California State Route 125 is the 22.3-mile (35.9 km) state highway in San Diego County, California, whose southern part, the South Bay Expressway toll road from State Route 54 to State Route 905, was built by a private operator and opened on 19 November 2007. The entire cost of the expressway portion was 843 million dollars; the operator filed for bankruptcy in March 2010 and SANDAG bought the lease for 341.4 million dollars in December 2011.
Reported project cost
$843 million
Cost basis: 2007
Wikipedia (California State Route 125), citing reference 114Free to play 路 No account needed
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthWikipedia (California State Route 125)
- 35.892 km
Project record
Opened or launched
Wikipedia (California State Route 54)19 November 2007