What was the 2022 cost estimate for the proposed Centre Port scheme?

Centre Port is the proposed 18 km tidal barrage, road and container port across the entrance of The Wash between Hunstanton in Norfolk and Gibraltar Point in Lincolnshire, England, announced in November 2022 by the developer Centre Port Holdings, with a terminal for 23,000 TEU ships and a target of construction from 2025 and completion in 2030, which is not built and has no planning consent. Its estimated cost is 2 billion pounds at 2022 prices, and New Civil Engineer in April 2023 called it a 2 billion pound tidal barrage.

Published project estimate

Planned

£2 billion

Approximately $2.47 billion

Cost basis: 2022

newcivilengineer.com
Try today’s cost challenge

Free to play · No account needed

Neath Port Talbot : L&A Outdoor Centre
Lewis ClarkeCC BY-SA 2.0

Cost evidence

Basis of the published figure

Published project estimate2022
newcivilengineer.com

Project metrics

Key dimensions

Total lengthNew Civil Engineer
18 km

Project record

Current completion estimate

New Civil Engineer

2030