Circle Drive is the 26.8 km ring road of Saskatoon, Saskatchewan, proposed in 1913, begun in 1961 and completed in 2013 with the roughly 7 km Circle Drive South section and its Gordie Howe Bridge, which opened on 31 July 2013. The City of Saskatoon estimates the total cost of the Circle Drive South project at 272.5 million Canadian dollars.

Reported project cost

CAD 272.5 million

Approximately $264.53 million

Cost basis: 2013

Wikipedia (Circle Drive), citing the City of Saskatoon, Circle Drive South Project
Try today鈥檚 cost challenge

Free to play 路 No account needed

Circle Drive (Northern View from 108 St ) in Saskatoon, Saskatchewan, Canada.
Ryan HodnettCC BY-SA 4.0

Cost evidence

Basis of the published figure

Reported project cost2013
Wikipedia

Project metrics

Key dimensions

Total lengthWikipedia (Circle Drive)
26.8 km

Project record

Opened or launched

Wikipedia (Circle Drive)

31 July 2013