Road or highway 路 United States
How much did the Farrow Parkway interchange project completed in 2014 cost?
Farrow Parkway is the four-lane, 3.5 mile parkway that connects US 17 and US 17 Business in Myrtle Beach, South Carolina, through the former Myrtle Beach Air Force Base, whose grade-separated single-point urban interchange with the US 17 Bypass and SC 707 at the base's back gate was one of the first priorities of Horry County's Riding on a Penny programme. The Sun News reported on 23 October 2014 that the ribbon cutting that day marked the completion of what became a 121.7 million dollar project, after a projected cost of 49.5 million.
Final project cost
$121.7 million
Cost basis: 2014
Wikipedia (Farrow Parkway), citing The Sun News (Back gate bridge ribbon cutting, Jason Rodriguez, 23 October 2014)Free to play 路 No account needed
Cost record
How the cost changed
Budgets, contracts and final costs may cover different stages. Each figure keeps its own year and source.
Project metrics
Key dimensions
- Total lengthWikipedia (Farrow Parkway)
- 5,633 m
Project record