How much did Hite Crossing Bridge cost to build?
The Hite Crossing Bridge is the steel through-arch bridge carrying Utah State Route 95 over the Colorado River arm of Lake Powell between Garfield and San Juan counties in Utah, about 200 ft above the lake, designed by David Sargent, advertised for bids on 29 June 1963 and dedicated on 3 June 1966, replacing the Hite ferry crossing flooded by Lake Powell. Its cost is given as 3 million dollars, approximately the bid estimate of 1963.
Try today’s cost challenge
Free to play · No account needed
DreanalinePublic domain
Cost evidence
Basis of the published figure
Final project cost1966
Project record
Opened or launched
Wikipedia (Hite Crossing Bridge)3 June 1966