Dam · Brazil

What is the estimated cost of the Jatobá Hydroelectric Power Plant?

The Jatoba Hydroelectric Power Plant is the proposed hydropower plant on the Tapajos River in Para, Brazil, planned as the second largest of the Tapajos Complex with 2,338 MW from 40 bulb turbines of 59.7 MW, a head of 16 m, a reservoir of 646.3 square kilometres and an annual output of 11,264 GWh, never built, after licensing requests were archived in 2016 and the project suspended in 2017. In May 2024 Eletrobras asked the regulator ANEEL to renew the authorization to study the plant with an estimated 1,649 MW. Its estimated cost is given as 4.4 billion dollars.

Published project estimate

Planned

$4.4 billion

Cost basis: 2011

Wikipedia (Jatoba Hydroelectric Power Plant)
Try today’s cost challenge

Free to play · No account needed

Rio Tapajos em Itaituba
WevertoncordeiroCC BY-SA 3.0

Cost evidence

Basis of the published figure

Published project estimate2011
Wikipedia

Project metrics

Key dimensions

Powerclimainfo.org.br
2,338 MW