How much did Johor–Singapore Causeway cost to build?

The Johor-Singapore Causeway is the 1,056 m rail, road and pipeline link between Johor Bahru in Malaysia and Woodlands in Singapore, built from 1919 by Topham, Jones and Railton of London after the contract of 30 June 1919, officially completed three months ahead of schedule on 11 June 1924 and opened on 28 June 1924. The National Archives of Malaysia and of Singapore, in a text republished by BiblioAsia, say that the total cost, estimated at 17 million Straits dollars, was borne by the governments of the Federated Malay States, Johor and the Straits Settlements.

Reported project cost

SGD 17 million

Approximately $5.55 million

Cost basis: 1924

The Singapore-Johor causeway, spanning across the Johor Straits. It is one of two bridges which connect Singapore to Malaysia and Continental Asia.
Img by Calvin TeoCC BY-SA 3.0

Cost evidence

Basis of the published figure

Reported project cost1924
biblioasia.nlb.gov.sg

Project metrics

Key dimensions

Project record

Timeline

  1. 1919

    Construction started

    biblioasia.nlb.gov.sg