The Kandovan Tunnel is the 1,883 m road tunnel through the Alborz mountains on the Chalus road between Tehran and the Caspian Sea in Iran, 5.5 m wide with a clearance of 6 m, one of the first tunnels in the country, where the first dynamite was used on 11 May 1935 and which Reza Shah opened on 17 May 1938. The construction cost was 24,853,400 rials, or 1,461,964 US dollars at the time, according to Persian news sources.

Reported project cost

$1.462 million

Cost basis: 1938

Wikipedia: Kandovan Tunnel
Try today’s cost challenge

Free to play · No account needed

<<<مناظرجاده چالوس تونل نزدیکی کندوان >>>
auoob farabiCC BY-SA 3.0

Cost evidence

Basis of the published figure

Reported project cost1938
Wikipedia

Project metrics

Key dimensions

Total lengthdangerousroads.org
1,883 m

Project record

Timeline

  1. 11 May 1935

    Construction started

    dangerousroads.org
  2. 17 May 1938

    Opened or launched

    dangerousroads.org