Dam · Ukraine
What is the estimated cost of Kaniv Pumped Storage Power Station as of 2007?
The Kaniv Pumped Storage Power Station is the unfinished pumped-storage hydropower plant at Buchak near Kaniv in Cherkasy Oblast, Ukraine, owned by Ukrhydroenergo, whose construction began in 1986, was halted in 1991 and was resumed in July 2016 after the Cabinet approved a hydropower development programme, now planned at 1,000 MW in turbine mode and 1,040 MW in pump mode with four reversible Francis turbines, reduced from an original design of 3,600 MW. Its budget is 12 billion hryvnias, of which 70 percent was to be financed by international financial institutions.
Published project estimate
UAH 12 billion
Approximately $2.38 billion
Cost basis: 2007
Wikipedia (Kaniv Pumped Storage Power Station)Free to play · No account needed
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- PowerWikipedia (Kaniv Pumped Storage Power Station)
- 1,000 MW
Project record
Construction started
Wikipedia (Kaniv Pumped Storage Power Station)1986