How much did Kazunogawa Pumped Storage Power Station cost to build?
The Kazunogawa Pumped Storage Power Station is the pure pumped-storage power station of the Tokyo Electric Power Company (TEPCO) in the mountains of Yamanashi Prefecture, Japan, between the Kamihikawa and Kazunogawa reservoirs, with a maximum output of 1.6 million kW (four units of 400,000 kW), an effective head of 714 m and a water flow of 280 cubic metres per second, the world's largest pump turbines at the time of planning. It was constructed at a cost of 2.2 billion US dollars, with unit 1 in 1999 and the last unit commissioned in 2014.
Reported project cost
$2.2 billion
Cost basis: 1999
Wikipedia: Kazunogawa Pumped Storage Power StationFree to play · No account needed