Energy · Japan

How much did Kazunogawa Pumped Storage Power Station cost to build?

The Kazunogawa Pumped Storage Power Station is the pure pumped-storage power station of the Tokyo Electric Power Company (TEPCO) in the mountains of Yamanashi Prefecture, Japan, between the Kamihikawa and Kazunogawa reservoirs, with a maximum output of 1.6 million kW (four units of 400,000 kW), an effective head of 714 m and a water flow of 280 cubic metres per second, the world's largest pump turbines at the time of planning. It was constructed at a cost of 2.2 billion US dollars, with unit 1 in 1999 and the last unit commissioned in 2014.

Reported project cost

$2.2 billion

Cost basis: 1999

Wikipedia: Kazunogawa Pumped Storage Power Station
Try today’s cost challenge

Free to play · No account needed

Fukashiro Dam (ja:深城ダム) is a dam in Yamanashi, Japan.
QurrenCC BY-SA 3.0

Cost evidence

Basis of the published figure

Reported project cost1999
Wikipedia

Project metrics

Key dimensions

PowerJBpress
1,600 MW

Project record

Timeline

  1. 1999

    Opened or launched

    jbpress.ismedia.jp
  2. 2014

    Completed

    jbpress.ismedia.jp