Dam · United States

How much did Lower Granite Dam cost to build?

Lower Granite Dam is the U.S. Army Corps of Engineers (Walla Walla District) run-of-river dam on the Snake River, built as part of the Lower Snake River Project authorized in the Rivers and Harbors Act of 1945, with six 135 MW turbines giving 810 MW, whose construction began in 1965, with three turbine units operating in 1975 and three more in 1979. Its construction cost is given as USD 624,098,663.

Reported project cost

$624.0987 million

Cost basis: 1975

Wikipedia: Lower Granite Dam
Try today’s cost challenge

Free to play · No account needed

Lower Granite Dam
DsduganCC BY-SA 4.0

Cost evidence

Basis of the published figure

Reported project cost1975
Wikipedia

Project metrics

Key dimensions

PowerUSACE
810 MW

Project record

Timeline

  1. 1965

    Construction started

    USACE
  2. 1979

    Completed

    USACE