How much did widening the M1 motorway between junctions 6a and 10 cost?

The M1 is Britain's first full-length motorway, whose first phase of 73 miles from St Albans in Hertfordshire to Crick in Northamptonshire, designed by Sir Owen Williams and built by John Laing and Son in the north and Tarmac Construction in the south, was opened on 2 November 1959; it has grown to about 193 miles. The original motorway has no single total cost, only costs of sections and schemes: GBP 1.5 million for the Aldenham to Beechtrees section in 1958, GBP 12 million for the Charnwood Forest section opened on 22 January 1965, and GBP 294 million for the later widening of the M1 between junctions 6a and 10 with 11 underbridges and seven overbridges.

Reported project cost

拢294 million

Approximately $458 million

Cost basis: 2009

90years.buildingcentre.co.uk
Try today鈥檚 cost challenge

Free to play 路 No account needed

M1 in Yorkshire south of Leeds.
Klaus with KCC BY-SA 3.0

Cost evidence

Basis of the published figure

Reported project cost2009
90years.buildingcentre.co.uk

Project record

Opened or launched

Building Centre

2 November 1959