Road or highway 路 United Kingdom
What was the expected cost of the first 5.25-mile section of the M20 motorway, opened in 1960?
The M20 is the 50.6-mile (81.4 km) motorway in Kent from Swanley to Folkestone, opened in sections from 1960: junctions 5 to 7 (the Maidstone Bypass) in 1960, junctions 7 to 8 in 1961, junctions 3 to 5 in 1971, junctions 1 to 2 in 1977, junctions 11 to 13 in 1981 and junctions 8 to 9 in 1991. The motorway has no single total cost; the 5.25-mile eastern section (junctions 5 to 7), opened in 1960, built by Costain and designed by Scott Wilson, was expected to cost GBP 1.5 million, and the contract for the 1.5-mile junctions 7 to 8 was awarded to Sir Robert McAlpine for GBP 822,928 in March 1959.
Published project estimate
拢1.5 million
Approximately $4.2 million
Cost basis: 1960