How much did the third and final stage of the M32 motorway cost?

The M32 motorway, the Bristol Parkway, was built in three stages: the first stage opened in September 1966, the second stage opened in July 1970 with Sir Robert McAlpine as contractor, and the third stage from Muller Road to Ashley Road and Newfoundland Road, built by Reed and Malik, completed the motorway in May 1975. The UK Motorway Archive of the Chartered Institution of Highways and Transportation records an estimated GBP 3,000,000 for stage 2 and a final cost of GBP 10,400,000 for stage 3; the cost of stage 1 was not found.

Final project cost

拢10.4 million

Approximately $23.01 million

Cost basis: 1975

UK Motorway Archive, CIHT (M32 Bristol Parkway)
Try today鈥檚 cost challenge

Free to play 路 No account needed

The M32 motorway, Bristol, England, seen from inside Stoke Park, with Duchess Pond (a fishing lake) in the foreground. The view is looking east. The blue motorway sign says that it is one third of a mile to Junction 1, which is the exit for Filton, Kingswood, the north Bristol Ring Road, and the A4174. The black car and the red car are travelling towards Bristol. A road bridge crosses the motorway, on the left of the picture.
Myself (Adrian PingstonePublic domain

Cost evidence

Basis of the published figure

Final project cost1975
ukmotorwayarchive.ciht.org.uk

Project record

Timeline

  1. 1966

    Opened or launched

    UK Motorway Archive, CIHT

Now make the guess

Could you estimate it without seeing the answer?

BudgetGuessr turns real project costs into a daily estimation challenge.

Play BudgetGuessr

Keep exploring

View all projects