How much was the entire 11-mile Newberg鈥揇undee Bypass on Oregon Route 18 expected to cost?
Oregon Route 18 is the state highway across northwest Oregon, about 85 km long, and the cost in this entry belongs to its Newberg-Dundee Bypass in Yamhill County, an 11-mile bypass of which only the 4-mile Phase 1 opened on 6 January 2018, with Phase 2A now under construction for completion in 2027. The entire 11-mile bypass was expected to cost USD 262 million, while the Newberg Graphic put phases 1 and 2 together at about USD 184 million in 2018 and ODOT lists USD 45.9 million for Phase 2A construction.