How much was Phipps Bend Nuclear Power Plant expected to cost?
The Phipps Bend Nuclear Plant was a planned two-unit TVA nuclear station of about 2.5 GW on the Holston River in Hawkins County, Tennessee, which was never completed and was abandoned in the early 1980s after construction began in 1977. POWER Magazine reported in 2017 that the project was more than 40 percent complete and that TVA had invested as much as USD 1.5 billion before abandoning it.
Try today鈥檚 cost challenge
Free to play 路 No account needed
Cliffton.reedCC BY-SA 4.0
Cost evidence
Basis of the published figure
Reported project cost1981