How much was Rampart Dam expected to cost?

The Rampart Dam was a proposed 510-foot (155-metre), 4,700-foot (1,433-metre) hydroelectric dam on the Yukon River at Rampart Canyon in Alaska, planned by the U.S. Army Corps of Engineers for 5,872 MW and a 9,844-square-mile reservoir that would have flooded the Yukon Flats and nine Alaska Native villages. Preliminary estimates in 1959 were USD 900 million, the Corps's 1970 estimate was USD 1.39 billion, Secretary of the Interior Stewart Udall opposed it in 1967 and the project was shelved, so it was never built.

Published project estimate

Cancelled

$1.39 billion

Cost basis: 1970

Wikipedia (infobox)
Try today’s cost challenge

Free to play · No account needed

An artist's rendition of the proposed Rampart Canyon Dam on the Yukon River, taken from a microcard reproduction of the U.S. Army Corps of Engineers report on the project.
U.S. Army Corps of EngineersPublic domain

Cost record

How the cost changed

Budgets, contracts and final costs may cover different stages. Each figure keeps its own year and source.

Published project estimate

1970

$1.39 billion

Wikipedia

Project metrics

Key dimensions

Total lengthWikipedia (infobox)
1,433 m