How much was Southern Crossing expected to cost?

The Southern Crossing is a proposed but never built highway structure across San Francisco Bay, south of the Bay Bridge and north of the San Mateo-Hayward Bridge, with several proposals since 1947 that differ in design and location and were not implemented because of cost, environmental and other concerns. The 1954 alignment would have been about 40,730 feet long, and the 1991 Bay Crossings Study by the Metropolitan Transportation Commission estimated a mid-bay bridge between San Bruno and San Leandro at USD 2 billion for four lanes and USD 4 billion for eight lanes with BART tracks. It is a planning concept, not a project with one agreed cost.

Published project estimate

Cancelled

$2 billion

Cost basis: 1991

files.mtc.ca.gov
Try today’s cost challenge

Free to play · No account needed

Never-used stub ramp, intended for an interchange with the never-built Southern Crossing, on the I-280 viaduct, seen in April 2021
Pi.1415926535CC BY-SA 4.0

Cost evidence

Basis of the published figure

Published project estimate1991
files.mtc.ca.gov

Project metrics

Key dimensions

Total lengthfiles.mtc.ca.gov
12.415 km