What was the 1952 cost estimate for the original Spaulding Turnpike between Portsmouth and Rochester?

The Spaulding Turnpike is a 33-mile toll highway (NH 16) in New Hampshire, named for governors Rolland and Huntley Spaulding, announced in August 1952 to link Portsmouth and Rochester at an estimated cost of USD 13.5 million. Construction started in 1954, the Portsmouth-Dover section opened in September 1956, the 24-mile original route opened on 29 August 1957, and a 12-mile extension through Milton opened on 20 August 1981. A separate reconstruction and widening of the 3.5-mile Newington-Dover section, including the Little Bay Bridges, is reported at USD 270 million.

Original budget

$13.5 million

Cost basis: 1952

constructionequipmentguide.com
Try today鈥檚 cost challenge

Free to play 路 No account needed

Toll plaza on the Spaulding Turnpike near Rochester, New Hampshire
Fletcher6CC BY-SA 3.0

Cost evidence

Basis of the published figure

Original budget1952
constructionequipmentguide.com

Project metrics

Key dimensions

Total lengthconstructionequipmentguide.com
53.527 km

Project record

Timeline

  1. 1954

    Construction started

    constructionequipmentguide.com
  2. 29 August 1957

    Opened or launched

    constructionequipmentguide.com