How much was the cancelled Sundesert nuclear plant in California expected to cost?
The Sundesert Nuclear Power Plant was a proposed California plant of two 974 MW Westinghouse pressurized water reactors, to be built by San Diego Gas & Electric about 15 miles southwest of Blythe in Riverside County after a 1976 application to the US Nuclear Regulatory Commission. Facing opposition from Governor Jerry Brown and a refusal by the state's Energy Commission, the plan was rejected in 1978 after about USD 100 million had been spent on it, and nothing was built. The twin-reactor plant was to cost USD 3 billion.
Published project estimate
Cancelled$3 billion
Cost basis: 1976
Wikipedia: Sundesert Nuclear Power PlantFree to play 路 No account needed
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- PowerGlobal Energy Monitor
- 1,948 MW