Energy 路 United States

How much was the cancelled Sundesert nuclear plant in California expected to cost?

The Sundesert Nuclear Power Plant was a proposed California plant of two 974 MW Westinghouse pressurized water reactors, to be built by San Diego Gas & Electric about 15 miles southwest of Blythe in Riverside County after a 1976 application to the US Nuclear Regulatory Commission. Facing opposition from Governor Jerry Brown and a refusal by the state's Energy Commission, the plan was rejected in 1978 after about USD 100 million had been spent on it, and nothing was built. The twin-reactor plant was to cost USD 3 billion.

Published project estimate

Cancelled

$3 billion

Cost basis: 1976

Wikipedia: Sundesert Nuclear Power Plant
Try today鈥檚 cost challenge

Free to play 路 No account needed

Blythe, California, and Colorado River, seen from the air. This is the border between California (on left) and Arizona (on right).
NorthwalkerCC0

Cost evidence

Basis of the published figure

Published project estimate1976
Wikipedia

Project metrics

Key dimensions

Now make the guess

Could you estimate it without seeing the answer?

BudgetGuessr turns real project costs into a daily estimation challenge.

Play BudgetGuessr

Keep exploring

View all projects