How much did the Tiger Brennan Drive Extension in Darwin cost?

Tiger Brennan Drive is a 19 km arterial road in Darwin, Northern Territory, linking the Darwin CBD to Palmerston and East Arm Port. Its main construction was the Tiger Brennan Drive Extension: 7.5 km of dual carriageway between Berrimah Road and Palmerston with a grade-separated interchange at the Stuart Highway, built by Macmahon and completed in December 2010 at a project end value of AUD 95 million, funded by the Commonwealth and Northern Territory governments as the largest part of the AUD 110 million East Arm Port Access Route. A AUD 165 million Berrimah Road overpass was added in 2023-2024.

Final project cost

AUD 95 million

Approximately $87.14 million

Cost basis: 2010

Australian National Construction Review (ANCR)
Try today鈥檚 cost challenge

Free to play 路 No account needed

Woolner, Northern Territory
BidgeeCC BY 3.0

Cost evidence

Basis of the published figure

Final project cost2010
ancr.com.au

Project metrics

Key dimensions

Total lengthancr.com.au
7,500 m

Project record