How much did the Tiger Brennan Drive Extension in Darwin cost?
Tiger Brennan Drive is a 19 km arterial road in Darwin, Northern Territory, linking the Darwin CBD to Palmerston and East Arm Port. Its main construction was the Tiger Brennan Drive Extension: 7.5 km of dual carriageway between Berrimah Road and Palmerston with a grade-separated interchange at the Stuart Highway, built by Macmahon and completed in December 2010 at a project end value of AUD 95 million, funded by the Commonwealth and Northern Territory governments as the largest part of the AUD 110 million East Arm Port Access Route. A AUD 165 million Berrimah Road overpass was added in 2023-2024.
Final project cost
AUD 95 million
Approximately $87.14 million
Cost basis: 2010
Australian National Construction Review (ANCR)Free to play 路 No account needed
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthancr.com.au
- 7,500 m
Project record
2010