Road or highway 路 United States
What was the projected cost of converting Alcoa Highway (US 129) in Tennessee to a freeway by 2023?
U.S. Route 129 in Tennessee is a 52.8-mile route, so it has no single construction cost. The big project on it is the Alcoa Highway (SR 115) corridor reconstruction near Knoxville: a seven-phase conversion of the non-access-controlled highway into a freeway of about 13 miles between Hall Road in Blount County and Cherokee Trail in Knox County, TDOT's biggest project ever. Groundbreaking was on 24 June 2016; the Maloney Road to Woodson Drive phase was finished in summer 2023 and the Topside Road to Maloney Road phase in spring 2026, while other phases are still to come. By 2023 the projected cost of the whole project exceeded USD 1 billion.
Published project estimate
Under construction$1 billion
Cost basis: 2023
Wikipedia: U.S. Route 129 in TennesseeFree to play 路 No account needed
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthARTBA (American Road & Transportation Builders Association)
- 20.921 km
Project record
Construction started
artba.org24 June 2016