Road or highway 路 United States
What is the total budget of the two-phase expansion of U.S. Route 281 in north San Antonio?
U.S. Route 281 in Texas is a long north-south highway of about 580 miles from the Rio Grande valley to the Red River, so it has no single construction cost. The big project linked to it here is the expansion of US 281 north of San Antonio from Loop 1604 to Borgfeld Drive at the Comal County line, which TxDOT is turning from a superstreet into a six-lane expressway with flyover ramps and non-tolled and carpool lanes: construction began in July 2017, phase one runs to Stone Oak Parkway and phase two to Borgfeld Drive, and the total is given as USD 532 million (USD 228 million plus USD 304 million).
Free to play 路 No account needed
Cost evidence
Basis of the published figure
Project record