U.S. Route 281 in Texas is a long north-south highway of about 580 miles from the Rio Grande valley to the Red River, so it has no single construction cost. The big project linked to it here is the expansion of US 281 north of San Antonio from Loop 1604 to Borgfeld Drive at the Comal County line, which TxDOT is turning from a superstreet into a six-lane expressway with flyover ramps and non-tolled and carpool lanes: construction began in July 2017, phase one runs to Stone Oak Parkway and phase two to Borgfeld Drive, and the total is given as USD 532 million (USD 228 million plus USD 304 million).

Published project estimate

Under construction

$532 million

Cost basis: 2021

San Antonio Report
Try today鈥檚 cost challenge

Free to play 路 No account needed

I took photo with Canon camera on U.S. Route 281 between San Antonio and Blanco, TX.
Billy HathornCC BY-SA 3.0

Cost evidence

Basis of the published figure

Published project estimate2021
sanantonioreport.org

Project record

Timeline

  1. 17 July 2017

    Construction started

    sanantonioreport.org
  2. 2023

    Current completion estimate

    San Antonio Report