Energy · Lithuania
How much was Visaginas Nuclear Power Plant expected to cost?
The Visaginas Nuclear Power Plant was a planned replacement for the closed Ignalina plant in eastern Lithuania, to be built by the project company VAE with Hitachi (GE Hitachi) as strategic investor holding 20% and Lithuania 38%, as a single 1,350 MW ABWR. The 2012 business plan put the cost at about EUR 5 billion, up to EUR 6.8 billion with interest, inflation and exchange rates, with opening scheduled for the end of 2022. An advisory referendum in October 2012 rejected new nuclear capacity by about 63%, the project company was wound down in late 2015, and in November 2016 the government postponed the plant.
Published project estimate
Cancelled€5 billion
Approximately $6.42 billion
Cost basis: 2012
OSW Centre for Eastern StudiesFree to play · No account needed
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- PowerOSW Centre for Eastern Studies
- 1,350 MW
Project record
Planned completion
OSW Centre for Eastern Studies31 December 2022