How much was Visaginas Nuclear Power Plant expected to cost?

The Visaginas Nuclear Power Plant was a planned replacement for the closed Ignalina plant in eastern Lithuania, to be built by the project company VAE with Hitachi (GE Hitachi) as strategic investor holding 20% and Lithuania 38%, as a single 1,350 MW ABWR. The 2012 business plan put the cost at about EUR 5 billion, up to EUR 6.8 billion with interest, inflation and exchange rates, with opening scheduled for the end of 2022. An advisory referendum in October 2012 rejected new nuclear capacity by about 63%, the project company was wound down in late 2015, and in November 2016 the government postponed the plant.

Published project estimate

Cancelled

€5 billion

Approximately $6.42 billion

Cost basis: 2012

OSW Centre for Eastern Studies
Try today’s cost challenge

Free to play · No account needed

Ignalina Nuclear Power Plant, Rimšės sen., Lithuania, 2018
TouariseCC BY-SA 4.0

Cost evidence

Basis of the published figure

Published project estimate2012
osw.waw.pl

Project metrics

Key dimensions

Project record

31 December 2022