How much did the general construction contract for Wanapum Dam on the Columbia River cost?

Wanapum Dam is a concrete and earthfill hydroelectric dam on the Columbia River about six miles downstream of Vantage, Washington, owned by Grant County Public Utility District. Construction began in July 1959 and power generation started in July 1963; the dam is 8,637 feet (about 2.6 km) long and 185 feet high from the deepest excavation, with ten generating units. Grant PUD lists the general construction contract at $93,277,690 and says the dam was paid for with revenue bonds, not tax money.

Contract value

$93.2777 million

Cost basis: 1963

Wanapum Dam photo taken from downstream in late April 2008.
Williamborg 01:57, 28 April 2008 (UTCPublic domain

Cost evidence

Basis of the published figure

Contract value1963
en.wikipedia.org

Project metrics

Key dimensions

PowerGrant County PUD
1,221.6 MW

Project record

Timeline