ArcelorMittal Orbit is a 114.5-metre observation tower and public artwork in Queen Elizabeth Olympic Park in east London. Designed by Anish Kapoor and Cecil Balmond for the London 2012 legacy, it was completed in May 2012 after an 18-month build. The structure uses about 2,000 tonnes of steel, almost 60% of it recycled, and a separate 178-metre tunnel slide was added in 2016.

Final project cost

£22.7 million

Approximately $35.86 million

Cost basis: 2012

The Orbit — at night.
you_only_live_twice from Lighthorne Heath, EnglandCC BY-SA 2.0

Cost evidence

Basis of the published figure

Final project cost2012
london.gov.uk

Project metrics

Key dimensions

Project record

Timeline

  1. 2010

    Construction started

    Queen Elizabeth Olympic Park
  2. 10 May 2012

    Completed

    Queen Elizabeth Olympic Park