Road or highway 路 United States

How much did Arroyo Seco Parkway cost to build?

The Arroyo Seco Parkway began as a landscaped, limited-access road linking Pasadena and Los Angeles. Work on the original section started in 1938, and California dedicated it on 30 December 1940 as an early model for the state's freeway network. The National Park Service describes that first link as 6.2 miles long. The road was extended south in later years to the Four Level Interchange; those later works are not included in the $5.75 million price reported at the 1940 dedication.

Reported project cost

$5.75 million

Cost basis: 1940

Four Level Interchange of Arroyo Seco Parkway and Highway 101, looking north-east from Downtown Los Angeles - in 1999. Elysian Park in upper left.
Brian GroganPublic domain

Cost evidence

Basis of the published figure

Reported project cost1940
tile.loc.gov

Project metrics

Key dimensions

Total lengthNational Park Service
9,977.9328 m

Project record

Timeline

  1. 22 March 1938

    Construction started

    Historic American Engineering Record
  2. 30 December 1940

    Opened or launched

    California Department of Transportation