How much did Autostrada A22 cost to build?

The A22 Brenner motorway links Modena in northern Italy with the Austrian border at the Brenner Pass. Construction began in 1964, the first Bolzano?Trento section opened in December 1968, and the last Chiusa?Bolzano Sud section made the full route continuous on 11 April 1974. The operator measures the motorway at 314 km, including about 31.2 km of bridges and viaducts and 30 one-way tunnels. Its reported construction cost belongs to the original motorway, not to later junctions or the proposed Campogalliano?Sassuolo extension.

Reported project cost

ITL 243 billion

Approximately $373.65 million

Cost basis: 1974

Motorway A22 in Bolzano
BoboseiptuCC BY-SA 3.0

Cost evidence

Basis of the published figure

Reported project cost1974
autobrennero.it

Project metrics

Key dimensions

Total lengthAutostrada del Brennero
314 km

Project record

Timeline

  1. 1964

    Construction started

    Autostrada del Brennero
  2. 11 April 1974

    Opened or launched

    Autostrada del Brennero