Spain's high-speed rail network began with the Madrid?Seville line, which opened for AVE services on 21 April 1992. AVE is the train-service brand, while Adif and Adif Alta Velocidad manage the rail infrastructure. This entry uses a dated network-investment snapshot rather than pretending that the continually expanding network has one final construction cost: by April 2017, Adif reported about EUR 51.775 billion invested in infrastructure already in service and routes still under construction. That figure excludes Renfe's train fleet. The CNMC recorded 3,143 km of high-speed infrastructure at the end of 2015; it is not a present-day network length.

Spent to date

€51.775 billion

Approximately $58.49 billion

Cost basis: 2017

Это схема линий высокоскоростных поездов AVE в Испании. Развитие сети верно для мая 2013 года
KontigerCC BY-SA 3.0

Cost evidence

Basis of the published figure

Spent to date2017
europapress.es

Project metrics

Key dimensions

Project record

Opened or launched

Adif Alta Velocidad

21 April 1992