How much did the Nagasandra?Madavara Green Line extension cost?

The Nagasandra?Madavara extension adds 3.14 km and three elevated stations to Bengaluru's Green Line, connecting the line to the Bangalore International Exhibition Centre. Construction began in June 2017, but the extension did not open to passengers until 7 November 2024. Bangalore Metro Rail Corporation reported a cost of ?1,168 crore for this specific stretch, including ?152 crore for land; the often-quoted ?30,695 crore is for the much larger Namma Metro Phase 2 programme, not this line extension.

Reported project cost

INR 11.68 billion

Approximately $139.6 million

Cost basis: 2024

Green Line Namma Metro trainset
Sameer2905CC BY-SA 4.0

Cost evidence

Basis of the published figure

Reported project cost2024
moneycontrol.com

Project metrics

Key dimensions

Project record

Timeline

  1. 2017

    Construction started

    Moneycontrol