How much did the extension of Bangkok Green Line North ? Mo Chit to Khu Khot cost?
The northern Green Line extension runs from Mo Chit through Saphan Mai to Khu Khot, adding 16 elevated stations to Bangkok's BTS network. The project consultant lists a cost of 58,862 million baht and a June 2015?December 2019 project period; this is the extension's reported project amount, not the cost of the entire BTS Skytrain system. The BTS operator reports approximately 19 km for the northern extension and says all 16 stations began full service on 16 December 2020. MRTA uses an 18.2 km route figure, reflecting a different measurement of the same corridor.
Reported project cost
THB 58.862 billion
Approximately $1.73 billion
Cost basis: 2017
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthBTS Group Holdings annual report 2021/22
- 19 km
Project record