How much did Beijing Daxing Line cost to build?

Beijing's Daxing Line is the 21.8-kilometre southern extension of Subway Line 4, running from Gongyi Xiqiao to Tiangongyuan through Fengtai and Daxing. Its 11 stations include one elevated and ten underground stations. Construction began in late 2007, and the line opened on 30 December 2010 with through trains onto Line 4. It is a different railway from the later Daxing Airport Express.

Reported project cost

CNY 9.58 billion

Approximately $1.39 billion

Cost basis: 2019

010 "City of Beijing"?
N509FZCC BY-SA 4.0

Cost evidence

Basis of the published figure

Reported project cost2019
pdf.dfcfw.com

Project metrics

Key dimensions

Project record

Timeline

  1. 2007

    Construction started

    Beijing MTR Corporation
  2. 30 December 2010

    Completed

    Beijing MTR Corporation