Railway · Canada

How much did Line 2 Bloor–Danforth cost to build?

Line 2 Bloor-Danforth is the east-west subway line of the Toronto Transit Commission, whose first section of about eight miles (12.9 km) from Keele Street to Woodbine Avenue opened to the public on 26 February 1966 after an official opening on 25 February by Prime Minister L.B. Pearson and Premier John Robarts, with extensions to Islington and Warden on 11 May 1968 and to Kipling and Kennedy in November 1980. The Toronto Transit Commission's own article of 1966 calls it the CAD 200 million Bloor-Danforth-University subway project, a figure that covered the Bloor-Danforth and the University subways together.

Reported project cost

CAD 200 million

Approximately $185.64 million

Cost basis: 1966

Head To Head near Old Mill subway station in Toronto with the tracks spanning the Humber River
Numinosity (Gary J Wood)CC BY-SA 2.0

Cost evidence

Basis of the published figure

Reported project cost1966
transittoronto.ca

Project metrics

Key dimensions

Total lengthcoupler.ttc.ca
12.9 km

Project record

26 February 1966