Railway · Canada

How much did the extension of Calgary CTrain — West LRT extension cost?

The West LRT extension added an 8.2 km double-track corridor and six stations to Calgary's CTrain network, with related road, pedestrian and cycling works. It is not the price of building the whole system, whose first South Line opened in 1981. The new route began service on 10 December 2012. A City of Calgary-commissioned transport study described the complete West LRT project's cost as approximately C$1.4 billion; the rounded figure covers the rail extension plus accompanying infrastructure, not just track and station construction. A 2014 City transit review reports 32,400 weekday passengers on the new line after its first year. The stored image illustrates a later CTrain vehicle downtown, not the West LRT worksite.

Reported project cost

CAD 1.4 billion

Approximately $1.27 billion

Cost basis: 2014

A CTrain vehicle in central Calgary in 2019, illustrating the rail system; the photograph is not a view of the West LRT construction project
Bernard SpraggCC0

Cost evidence

Basis of the published figure

Reported project cost2014
calgary.ca

Project metrics

Key dimensions

Project record

Timeline

  1. 10 December 2012

    Opened or launched

    Calgary Transit, West LRT One Year Review