Railway · Australia

About how much did Canberra City-to-Gungahlin light rail Stage 1 cost the ACT Government to design and build?

Canberra's first light-rail stage links Alinga Street in the city centre with Gungahlin Place. The 12 km line with 13 stops and 14 vehicles opened for public passenger service on 20 April 2019. The ACT Government's project delivery report gives approximately AUD 675 million as the Territory's actual design-and-construction cost, including contingency but excluding agency and independent-certifier costs. This is Stage 1 only, not the future city-wide light-rail network or its long-term operating payments.

Reported project cost

AUD 675 million

Approximately $469.24 million

Cost basis: 2019

Canberra light rail Stage 1 (City to Gungahlin) in Australia
BidgeeCC BY-SA 3.0 au

The short answer

AUD 675 million

The ACT Government reports approximately AUD 675 million as its actual design-and-construction cost for the City-to-Gungahlin Stage 1 line. Its approved business-case estimate was AUD 783 million, and the anticipated contract-signing cost was AUD 707 million.

Cost evidence

Basis of the published figure

Reported project cost2019
treasury.act.gov.au

What the number includes

Cost scope

This amount covers Stage 1 design and construction costs to the Territory, including construction-phase contingency. The report excludes agency and independent-certifier costs. It does not price later network extensions or 20 years of operating payments.

Project metrics

Key dimensions

Project record

Project context

About Canberra light rail Stage 1 (City to Gungahlin)

The 12-km City-to-Gungahlin route opened for passengers on 20 April 2019 with 13 stops and 14 vehicles. It is the first phase of Canberra's planned wider light-rail network.

Reading the data

How to interpret the figure

The cost, scope, comparison figures, route length and opening date all come from the ACT Government's 2019 project delivery report. The nominal AUD amount is converted to USD using the World Bank 2019 annual-average official rate; no inflation adjustment is applied. The separate Wikidata line R1 item identifies this stage rather than the parent network.