What was the 2011 estimate for rebuilding the Capital Crescent Trail along the Purple Line?
The Capital Crescent Trail is the 7.04-mile (11.3 km) rail trail between Georgetown in Washington, D.C., and Silver Spring in Maryland on the former Georgetown Branch railroad, whose Bethesda to Silver Spring section is being rebuilt as a paved trail alongside the Purple Line light rail, with a first 670 ft section opened on 24 May 2024 and the Elm Street to Connecticut Avenue segment scheduled for spring 2027. The Washington Post reported in 2011 that the cost of building the extended trail would be 103 million dollars, up from 65 million, half of it for widening the Air Rights Tunnel in Bethesda.
Free to play · No account needed
Cost record
How the cost changed
Budgets, contracts and final costs may cover different stages. Each figure keeps its own year and source.
Published project estimate
2011$103 million
washingtonpost.comOriginal budget
2011$65 million
washingtonpost.comProject metrics
Key dimensions
- Total lengthwashingtonpost.com
- 11.33 km
Project record
Current completion estimate
washingtonpost.com2027