What was the 2011 estimate for rebuilding the Capital Crescent Trail along the Purple Line?

The Capital Crescent Trail is the 7.04-mile (11.3 km) rail trail between Georgetown in Washington, D.C., and Silver Spring in Maryland on the former Georgetown Branch railroad, whose Bethesda to Silver Spring section is being rebuilt as a paved trail alongside the Purple Line light rail, with a first 670 ft section opened on 24 May 2024 and the Elm Street to Connecticut Avenue segment scheduled for spring 2027. The Washington Post reported in 2011 that the cost of building the extended trail would be 103 million dollars, up from 65 million, half of it for widening the Air Rights Tunnel in Bethesda.

Published project estimate

Under construction

$103 million

Cost basis: 2011

washingtonpost.com
Try today’s cost challenge

Free to play · No account needed

The Residences at Capital Crescent Trail, apartments in the Westbard area of Bethesda. 5325 Westbard Avenue, Bethesda, Maryland 20816.
G. Edward JohnsonCC BY 4.0

Cost record

How the cost changed

Budgets, contracts and final costs may cover different stages. Each figure keeps its own year and source.

Project metrics

Key dimensions

Total lengthwashingtonpost.com
11.33 km

Project record

Current completion estimate

washingtonpost.com

2027