How much does the phase 2 of Chennai — Phase 2 cost?

Chennai Metro Phase 2 is the extension of the Chennai Metro in Tamil Nadu, India, of three corridors, Line 3 (Madhavaram to SIPCOT), Line 4 (Light House to Poonamallee) and Line 5 (Madhavaram to Sholinganallur), totalling 116 to 119 km with some 125 to 128 stations, of which the 14.6 km Poonamallee–Vadapalani stretch was inaugurated on 11 October 2026, bringing the operating Phase 2 network to 68 km. The Metro Rail Guy, updated in January 2026, says the 2019 estimate of 69,180 crore rupees was revised down to 61,843 crore by reducing station sizes.

Published project estimate

INR 618.43 billion

Approximately $7.1 billion

Cost basis: 2026

An Alstom Metropolis train-set at Guindy Metro station in Chennai.
Arjun1001CC BY-SA 4.0

Cost evidence

Basis of the published figure

Published project estimate2026
superprep.io

Project metrics

Key dimensions

Total lengthThe Metro Rail Guy
116.1 km

Project record

Opened or launched

The Hindu via Superprep

11 October 2026