How much was Cross River Tram expected to cost?
The Cross River Tram was the proposed 10-mile (16 km) north-south tram system in London from Camden Town through King's Cross, Waterloo and Elephant & Castle to Peckham and Brixton, due to begin operation by 2016, which the mayor cancelled in 2008 because of funding problems, when Transport for London said it was not in a position to develop the scheme any further. The 1.3 billion pound project was cancelled in 2008 as part of a move to save 2.4 billion pounds of transport-related funds.
Published project estimate
Cancelled£1.3 billion
Approximately $2.39 billion
Cost basis: 2008
Wikipedia (Cross River Tram)Free to play · No account needed
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthWikipedia (Cross River Tram)
- 16 km
Project record
Planned completion
Wikipedia (Cross River Tram)2016