How much was Cross River Tram expected to cost?

The Cross River Tram was the proposed 10-mile (16 km) north-south tram system in London from Camden Town through King's Cross, Waterloo and Elephant & Castle to Peckham and Brixton, due to begin operation by 2016, which the mayor cancelled in 2008 because of funding problems, when Transport for London said it was not in a position to develop the scheme any further. The 1.3 billion pound project was cancelled in 2008 as part of a move to save 2.4 billion pounds of transport-related funds.

Published project estimate

Cancelled

£1.3 billion

Approximately $2.39 billion

Cost basis: 2008

Wikipedia (Cross River Tram)
Try today’s cost challenge

Free to play · No account needed

River Thames in London: with Waterloo Bridge and Victoria Embankment in the centre. Several permanently moored ships are visible: TS Queen Mary, St Katharine, HMS Wellington, HMS President. The piers below Waterloo Bridge are Savoy Pier (left) and Festival Pier (right).
Tom ArthurCC BY-SA 2.0

Cost evidence

Basis of the published figure

Published project estimate2008
Wikipedia

Project metrics

Key dimensions

Project record

2016

Now make the guess

Could you estimate it without seeing the answer?

BudgetGuessr turns real project costs into a daily estimation challenge.

Play BudgetGuessr

Keep exploring

View all projects