How much did Delhi — Noida Metro cost to build?
The Noida Metro Aqua Line is the fully elevated 29.7 km metro line with 21 stations connecting Noida and Greater Noida in Uttar Pradesh, India, built by the Noida Metro Rail Corporation with Delhi Metro Rail Corporation as turnkey consultant, with construction begun in 2014 to 2015 and commercial service opened on 25 January 2019. Railway Technology lists its estimated investment as 55.03 billion rupees, and Wikipedia says the corridor was completed at a cost of 5,503 crore rupees according to the corporation.
Reported project cost
INR 55.03 billion
Approximately $781.45 million
Cost basis: 2019
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthRailway Technology
- 29.7 km
Project record