What budget was designated for the light rail part of T-REX in Denver?
The Southeast Corridor light rail line of the Regional Transportation District, now the E Line, is the 19-mile line with 13 stations in the south-east of Denver, Colorado, built as the light-rail part of the T-REX Transportation Expansion Project with a groundbreaking on 24 September 2001 and opened ahead of schedule and under budget on 17 November 2006. RTD says that of the 1.67 billion dollar T-REX budget, 879 million dollars was designated for light rail.
Approved budget
$879 million
Cost basis: 2006
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthRegional Transportation District
- 30.6 km