Railway · Bangladesh

What is the revised budget of Dhaka — Line 5?

Dhaka Metro Line 5 Northern Route (MRT Line-5) is the planned metro line of about 20 km with 14 stations from Hemayetpur to Bhatara in Dhaka, Bangladesh, of which 13.5 km with 9 stations is underground and 6.5 km with 5 stations is elevated, with depot works begun on 4 November 2023. The Business Standard reported on 15 September 2026 that its cost was revised from 41,238.54 crore taka to 89,848.36 crore taka, with the full operation target moved from 2028 to 2032.

Revised budget

BDT 898.4836 billion

Approximately $7.37 billion

Cost basis: 2026

Uttara Uttor Dhaka Metro Rail Station platform
Dead.rabbitCC BY-SA 4.0

Cost evidence

Basis of the published figure

Revised budget2026
en.prothomalo.com

Project metrics

Key dimensions

Total lengthThe Business Standard
20 km

Project record

Timeline

  1. 4 November 2023

    Construction started

    tbsnews.net
  2. 2028

    Planned completion

    The Business Standard
  3. 2032

    Current completion estimate

    The Business Standard