Railway · United States

How much did East Boston Tunnel (1904 Blue Line core) cost to build?

The East Boston Tunnel carried streetcars beneath Boston Harbor from Maverick Square to downtown Boston when it opened on 30 December 1904. It is the historic core of today's MBTA Blue Line, not a construction project for the entire modern line. The Boston Transit Commission began the original tunnel on 5 May 1900. A 1905 engineering account measured the route between Maverick and Court Street at about 7,450 feet and described its twin tracks and concrete construction. Contemporary reporting rounded the opening-era cost to about US$3 million; later financial summaries put the original tunnel at roughly US$3.5 million, so neither number should be presented as a uniquely certified final account. A separate westward extension to Bowdoin opened in 1916. The Transit Commission recorded about US$2.24 million of net cost for that extension by June 1918, while a 1916 contemporary estimate had put it at US$2.4 million. Later conversion to rapid-transit trains and further Blue Line extensions are outside this original-tunnel cost scope.

Reported project cost

$3 million

Cost basis: 1904

An inbound train at Orients Heights station in November 2013, one day after the new station opened after a 6-month closure.
Pi.1415926535 This photo was taken with Canon PowerShot SX150 ISCC BY-SA 3.0

Cost evidence

Basis of the published figure

Reported project cost1904
libraryarchives.metro.net

Project metrics

Key dimensions

Project record

Timeline

  1. 5 May 1900

    Construction started

    Boston Transit Commission 24th annual report
  2. 30 December 1904

    Opened or launched

    Boston Transit Commission 24th annual report