Railway · Canada

What is the programme budget for GO Expansion in Ontario?

GO Expansion is the Metrolinx programme to turn the GO Transit commuter rail network of the Greater Toronto and Hamilton area into all-day, two-way service with about 150 km of new track, new bridges and tunnels and partial electrification, planned in 2018 to finish in 2032 at a cost of 32 billion Canadian dollars. The Toronto Star, reported by Yahoo Finance Canada on 1 April 2026 from internal Metrolinx documents, described it as a 27 billion dollar expansion that is delayed and scaled back, with electrification of the Stouffville, Kitchener and Barrie lines dropped from the new 10-year window.

Published project estimate

Under construction

CAD 27 billion

Approximately $19.31 billion

Cost basis: 2026

Yahoo Finance Canada / money.ca, reporting by the Toronto Star (Metrolinx scales back GO expansion as internal reports signal delays, 1 April 2026)
Try today’s cost challenge

Free to play · No account needed

Vancouver Public Central Library
GoToVan from Vancouver, CanadaCC BY 2.0

Cost evidence

Basis of the published figure

Published project estimate2026
ca.finance.yahoo.com

Project record

Planned completion

ca.finance.yahoo.com

2032