What construction cost does the Golden 1 Center project engineer report?
The Sacramento Kings' Golden 1 Center opened in 2016 as a multipurpose downtown arena with a public plaza and adjacent practice facilities. Structural engineer Buehler Engineering reports US$558 million in construction cost for the arena project, which spans four city blocks. The figure is not the City of Sacramento's smaller public contribution or the original, lower preconstruction estimate.
Reported project cost
$558 million
Cost basis: 2016
Rudy Garcia from Elk Grove, CA, USACC BY 2.0
Cost evidence
Basis of the published figure
Reported project cost2016
Project record
Opened or launched
Buehler Engineering2016