Railway · Hong Kong SAR China
What funding was approved for the Tuen Mun South Extension?
The Tuen Mun South Extension is the 2.4 km extension of the Tuen Ma line of the Hong Kong MTR southwards from Tuen Mun Station to a new intermediate station at Tuen Mun Area 16 and a terminus near Tuen Mun Ferry Pier, being built by MTR Corporation under the ownership approach, with construction starting in 2023 for completion in 2030. The Executive Council approved in September 2023 a total of 25.6 billion Hong Kong dollars for the Kwu Tung Station and the Tuen Mun South Extension, of which 15.8 billion was for Tuen Mun South.
Approved budget
HKD 15.8 billion
Approximately $2.02 billion
Cost basis: 2023
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthHighways Department (HKSAR)
- 2,400 m