Railway · Belgium

Approximately how much did HSL 3 between Liège and the German border cost, excluding the wider eastern high-speed branch?

HSL 3 is the Belgian high-speed railway between Liège and the German border. Infrabel describes the corridor as about 54 kilometres in total, including 36 kilometres of new line and the 6.5-kilometre Soumagne tunnel. Its June 2009 railway magazine reports that this line cost approximately €830 million, separate from the €2.2 billion eastern branch between Brussels and the border. Construction began in 2001, the track was approved in 2007, and trains entered service on 14 June 2009.

Reported project cost

€830 million

Approximately $1.16 billion

Cost basis: 2009

Railroad near Walhorn, Belgium, Highspeedline (HSL) 3 between Aachen and Liège.
Wi1234CC BY-SA 3.0

Cost evidence

Basis of the published figure

Reported project cost2009
tassignon.be

Project metrics

Key dimensions

Project record

Timeline

  1. 14 June 2009

    Opened or launched

    Infrabel and SNCB — Connect, June 2009