How much did the phase 1 of Jaipur — Metro — Phase 1 cost?
The Jaipur Metro Phase 1 is the east-west Pink Line of the Jaipur Metro in Rajasthan, India, from Mansarovar to Badi Chaupar, about 12 km with 11 stations, built by the state-owned Jaipur Metro Rail Corporation, with the 9.63 km Mansarovar to Chandpole section opened on 3 June 2015 and the 2.34 km underground section to Badi Chaupar opened on 23 September 2020. Metro Rail Today gives the project cost as 3,149 crore rupees, the same figure as the Wikipedia article for the corridor.
Reported project cost
INR 31.49 billion
Approximately $400.61 million
Cost basis: 2022
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthMetro Rail Today
- 12 km
Project record