How much did Jammu–Baramulla line cost to build?

The Jammu-Baramulla line is the railway of about 324 km from Jammu to Baramulla in Jammu and Kashmir, India, whose 272 km Udhampur-Srinagar-Baramulla Rail Link (USBRL) section, with 36 tunnels totalling 119 km, 943 bridges, India's longest transport tunnel T-50 of 12.77 km and the 359 m high Chenab arch bridge, was inaugurated by Prime Minister Narendra Modi on 6 June 2025 together with the first Katra to Srinagar Vande Bharat train. The Daily Jagran reported that it was built at a cost of 43,780 crore rupees, against an estimated total of over 37,000 crore at the Tribune's January 2024 report and 28,000 crore (2022) in Wikipedia.

Final project cost

INR 437.8 billion

Approximately $5.02 billion

Cost basis: 2025

Srinagar Railway Station on a snowy morning
PP YoonusPublic domain

Cost evidence

Basis of the published figure

Final project cost2025
tribuneindia.com

Project metrics

Key dimensions

Total lengthThe Daily Jagran
272 km

Project record

Opened or launched

The Daily Jagran

6 June 2025