How much does Khurda Road–Bolangir line cost?
The Khurda Road-Bolangir line is the 289 km broad-gauge new railway line under construction by the East Coast Railway in Odisha, India, to connect western Odisha with eastern Odisha, including tunnels such as the 1.77 km tunnel T-2 that broke through in June 2025 and the 1.9 km tunnel T-7 that received a safety system in February 2026. Indian Infrastructure reported in June 2025 and again in February 2026 that its estimated cost is Rs 37.91 billion.
Published project estimate
INR 37.91 billion
Approximately $434.95 million
Cost basis: 2025
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthIndian Infrastructure
- 289 km